Home> Simulation System > Brilliant Achievements
Brilliant Achievements

Brilliant Achievements

Brilliant Achievements in 20 Years
Since the produce of the first 300MW coal-fired simulator for the first time in China in the year of 1989, more than two hundred various programs have been developed by SinoSimu with a market covering 28 provinces, municipalities and autonomous regions. We are always at the leading place in the area of simulation at home and are accessing into the international market.

Programs already developed include: simulator for coal-fired power generation unit(6MW~1000MW conventional generator unit, 125MW~330MW circulating fluidized bed unit, gas engine unit, gas-steam combined cycle unit), hydro power simulator (conventional hydro power plant, pumped storage power plant) , simulator for wind power station, simulator for solar power station, simulator for biomass power station, simulator for grid and transformer substation (power grid, 110KV~500kv transformer substation), research-type simulation system, simulator for aeronautics and astronautics, simulator for nuclear submarine, management system for power enterprise, computer supervision and control system, real-time evaluation system of the operation performance for the power plant.
top