Simulation System of the Fossil-Fired Power Generation Unit

Thermal Power Unit Simulator

Not only can the thermal power unit simulator satisfy the technical requirements proposed by users, but also it can even excel the technical norms and standards which are set by relative departments of China.
The scope of thermal power unit simulator includes:
 The conventional power generation units such as 100MW, 200MW, 600MW,1000MW, and so on
  Fluidized bed units of 125MW to 300MW
 Air cooling units
 Desulfurization units
 Gas units, and so on

All thermal power simulators possess the characteristics as following:
It can realize the simulation to the whole process of production in power plant; normal startup and shutdown of rated parameters; startup, operation, and shutdown of variable parameter; operating features of units with basic load; operating features of units with peak load; cold, warm, hot and extreme hot startup and operation; transient characteristics of tripping because of malfunction, all kinds of operation and other disturbance.
All models comply with the fundamental laws of physics, math, and electric power science rather than the presetting relative curve. Any approximate assumption and calculating method should not reduce the requirement of model fidelity.
All models of equipments and systems could reflect the dynamic process very well. Besides, it should have higher static precision in order to the constant and real-time simulation to the simulation object. The simulation effect is the same to the condition of actual operating unit. And the simulation environment should make the trainees feel no difference from the units which is simulated.
Having perfect training function to the operating personnel, it can provide the trainees with the real-time operating condition including the normal condition and malfunction of actual site so that the professional knowledge, operating skills, response ability and proficiency degree can be improved effectively for the trainees. After training, the operating personnel can master proficiently the startup and shutdown process of unit and all operation which can maintain the normal operation, know the solution of abnormal accidents and emergency, improve ability of actual operation as well as analysis and judgment, train handling ability to the emergency, making sure the unit operation in the safe and economical condition.
It can analyze and improve the operation scheme and method of unit operation under different conditions, and make them optimization.
Regular rotating training to the operation personnel, and the staff in the thermal control maintenance and technical administration position can be supplied, which can be regarded the evaluation method before working or promoting and reflect objectively the actual operation ability and analysis and judgment ability of the trainees.
Having the capability to simulate and research the control system of the unit in order to select the optimized control scheme and dynamic setting parameter.
Having the capability to analyze the unit malfunction reasons and results for the purpose of improving the operation and formulating measures of anti-accident.
top